BELL ENTIÈREMENT ÉLECTRIQUE A-FRAME DREDGER

    Un modèle entièrement électrique Bell A-Frame Dredger, équipé d'une pompe Bell 250E et d'une double tête cutter, est actuellement en cours de fabrication en Europe centrale.

    Orange dredging pump platform floating on a water basin, with a crane boom, control cabin, and container unit on board, connected to a floating pipeline with orange buoys extending across the water, surrounded by an excavated sandy site with trees in the background.
    Orange dredging pump platform floating on a water basin, with a crane boom, control cabin, and container unit on board, connected to a floating pipeline with orange buoys extending across the water, surrounded by an excavated sandy site with trees in the background.
    Aerial view of a floating dredging pump operating in a sand extraction pond, connected to a curved discharge pipeline with orange floats, surrounded by excavated sandy terrain, agricultural fields, and industrial buildings in the background.

    Une nouvelle carrière de sable et de gravier sera creusée pour atteindre, à terme, une profondeur de 45 mètres. Bell Dredging Pumps propose une large gamme d'équipements de dragage réputés pour leur durabilité, leur puissance et leurs nombreuses options.