BELL 100 DOUBLE CUTTER HEAD, TERNEUZEN

    These photo’s are made at Sassevaart near Terneuzen, where we are emptying tubular piles for the construction of the Nieuwe Sluis (North Sea Port).

    Bell 100 dual-cutter dredge pump head mounted on a crane, positioned between numbered steel sheet piles (78-82) at a construction site, with a Bell power unit generator visible in the foreground.
    Crawler crane and Bell Dredging Pumps vibratory hammer installing steel sheet piles at a construction site during sunset, with workers in high-visibility safety gear supervising the operation.
    Row of large steel casing pipes extending across a dredged waterway at a construction site, with sand piles, cranes, and pipelines in the background.

    The Bell 100 equipped with a double cutter head has a diameter of 1,1 meter and is lowered into the piles to pump the sand, clay and debris out. Because the pump is equipped with a water jet ring around the center the pile wall gets cleaned simultaneously. 15 Meters of soil is dredged at a rate of 0,5 hour per pile. The work will finish soon with already 120 piles having been emptied and cleaned at this moment.