The start-up & training has been completed and the Bell Amphibious Excavator is currently deployed on its first project.
Attached to the Bell amphibious excavator is a BELL 200 dredge pump with cutter head to agitate the sand and pump it to a new location where new land will be created. This amphibious excavator is equipped with 4 spud poles to ensure maximum stability during its dredging operations.