Within one week, the complete spread including power pack, two water jet pumps with lift pumps, hydraulic hoses, discharge hoses, Bell 400 + sand head and Bell 250 + double cutter head were on site.
The work included dredging around offshore foundations for which we supplied an operator too.
That’s the advantage of Bell Dredging.