Equipment delivered to an offshore project

    A Bell 400 and Bell 250 pump were delivered on very short notice to an offshore customer of ours.

    Within one week, the complete spread including power pack, two water jet pumps with lift pumps, hydraulic hoses, discharge hoses, Bell 400 + sand head and Bell 250 + double cutter head were on site.

    The work included dredging around offshore foundations for which we supplied an operator too.

    That’s the advantage of Bell Dredging.