BELL 100 DOUBLE CUTTER HEAD, IJMUIDEN

    Bell Dredging Equipment rented out the BELL100 with double cutter head to two major construction companies in the Netherlands, which are building the biggest sea lock in the world.

    Bell Dredging Pumps submersible dredge pump suspended from a crane by chains and hydraulic hoses at a construction site, with workers in orange safety gear and rebar visible below against a clear blue sky.
    Harbor view with grassy embankment leading to calm water, a wooden pier, and multiple construction cranes along the waterfront under a partly cloudy sky.
    Crane lifting a Bell Dredging Pumps submersible dredge pump with orange cutter attachments against a blue sky with wispy clouds.

    They will remove a meter of clay from the appendix on the caissons, something that has proved impossible with other pumps and water jetting.

    Thanks to the double cutter configuration, the pump can be used free-hanging from a cable, which is impossible with a normal, single cutter.

    This set-up is the only free-hanging tool on the market that can both cut and pump simultaneously. In addition, the double cutter is also equipped with water jet nozzles in and around the rotating heads to keep them free of clay.

    Submersible dredge pump being lowered by chain hoist into a deep concrete shaft filled with dark water, with cables, hoses, and lifting straps visible along the shaft walls.