Our customer is using a Bell 150 with flat barge head in the center of Amsterdam where the bottom of the canal must be cleaned and leveled before the under water concrete can be poured.
By working with an excavator with GPS in combination with the Flat Barge Head on the pump, they can level the bottom until the exact right height.